Office of the Director of Public Prosecutions, Wagga Wagga.

Specifications

Space

800sqm

Contract

MW21 Fixed Cost

Duration

14 weeks

Value

$1.61M

Scope of Works

  • Full fit-out of L2 and 3 in a live environment
  • Acoustic-rated partitions, ceilings, and doors
  • Accessible and secure workspaces, meeting rooms, and comms room
  • Integration of mechanical, electrical, fire, and security services
  • Joinery, workstation, and furniture installation
  • Operable wall installation with electric seals
  • Site-specific WHS, quality assurance, and environmental controls

Innovatus Projects was engaged to deliver a full refurbishment of L3 and a new fit-out of L2, transforming the space into a secure, acoustically treated, and highly functional office environment. The team led early-stage activities including stakeholder engagement, site evaluation, WHS planning, and coordination with incumbent service providers.

Construction was delivered in two distinct stages to accommodate operational constraints; Level 2 was completed before works began on Level 3. Acoustic and security specifications were paramount due to the sensitive nature of the ODPP’s operations. All consultation and office spaces were built with high acoustic ratings and secure access control measures. Systems such as HVAC, fire. electrical, and data were upgraded and fully integrated with the building’s BMS.

What our clients say

Projects

See our work.

63 Burelli St, Wollongong

Community Gateway Life Centre

San Churro

Pittsway Arcade Food Court

Ready to start your project?

contact

Connect with us.

Wollongong
96 Smith St
Wollongong NSW 2500

Sydney
Level 20/135 King St,
Sydney NSW 2000

Canberra
Level 8/121 Marcus Clarke St,
Canberra ACT 2600

Brisbane
Northbank Plaza,
Level 22/69 Ann St,
Brisbane QLD 4000

This field is for validation purposes and should be left unchanged.