Lazard Asset Management

Innovatus Projects delivered an extraordinary transformation of the prominent building located on 1 Macquarie St, Sydney. With precision, professionalism, and a dedication to safety and compliance, our team completed this full fit-out in an 8 week timeline. The new workspace includes two board rooms, three private meeting rooms and an open plan area. Incorporating cutting-edge […]

Office of the Director of Public Prosecutions, Wagga Wagga.

Innovatus Projects was engaged to deliver a full refurbishment of L3 and a new fit-out of L2, transforming the space into a secure, acoustically treated, and highly functional office environment. The team led early-stage activities including stakeholder engagement, site evaluation, WHS planning, and coordination with incumbent service providers. Construction was delivered in two distinct stages […]

Service NSW, Armidale

The SNSW Armidale project involved the full transformation of a cold shell tenancy into a purpose-built, contemporary Service NSW Centre. Innovatus Projects was appointed to deliver a comprehensive internal fit out, ensuring all works met the operational, accessibility, and compliance standards required of a public-facing government facility. The project was executed under the MW21 contract […]

Legal Aid Parramatta

The project was awarded to Innovatus Projects following a competitive tender process. This project presented a unique challenge, as the floor was originally designed as a carpark, resulting in restricted ceiling heights. The team successfully transformed the space into a fully functional and aesthetically appealing client and workspace.

Office of the Director of Public Prosecutions

Innovatus Projects successfully delivered a high-performing office fitout within an accelerated 11-week program, transforming a cold shell into a sophisticated, acoustically rated workspace. The scope included high acoustic-rated partitions and ceilings, acoustic door seals, and an operable wall system with electric seals for flexible breakout and boardroom spaces. An accessible bathroom was constructed with core […]

Headspace Edmonson Park

Headspace at Edmondson Park was both an exciting and challenging endeavour. A critical requirement for this project was the need for complete soundproofing of the consultation rooms. Given the sensitive nature of the work being carried out, it was essential that these rooms be free from external noise interference and transference. Innovatus Projects successfully met […]

Self Reflections Mental Health Clinic

As one of Wollongong’s leading Mental Health services, Self Reflections required a warm and tranquil space for their clients to feel at home in. A total of six consult rooms along with reception and a staff kitchen were refurbished to create a welcoming and calm environment for both clients and team. High quality finishes were […]

Joint Vision Orthopaedic Group

Innovatus Projects partnered with The Bold Collective for the design and GWA for engineering services. The project transformed a warehouse into a medical facility, prioritising client experience and efficiency. Key challenges included converting the existing structure, ensuring accessibility, reducing parking spaces from 20 to 7, and managing infrastructure upgrades, which involved removing a significant portion […]

Port Kembla Coal Terminal

The Port Kembla Control Tower (PKCT), built in the 1970s with outdated materials, had only undergone minor repairs since its construction. Innovatus Projects was engaged to refurbish the control tower for the first time in 40 years, using an open book construction management model. The project involved removing all hazardous materials from the façade, roof, […]

University of Wollongong, South32

Innovatus Projects refurbished the Wollongong office of global mining and minerals giant South32, located within the University of Wollongong Innovation Campus. The project entailed a complete de-fit of the existing workspace, along with the safe removal of debris. Innovatus employed carefully considered methods to prevent any damage to the building during this process, ensuring compliance […]